ABBOTT LABS
Tipp City, Ohio

This project consisted of over 12 feet of compacted base soil for the massive foundations to support 45 feet tall continuously poured columns. The poured in place roof was supported by post tension cable system and reinforcement steel. Several buildings were constructed for the project which included tank foundations, elevated mezzanine slabs, water treatment facilities and roadways. The world class production facility was constructed on schedule under the care of FA Wilhelm Construction Company.
Patriot provided the inspections and material testing for the soil, foundations and reinforcement, concrete, bolts, welding, post tensioning systems, masonry, slabs, fireproofing, floor flatness, waterproofing, roadbeds, x- ray for roof penetrations, and extensive material laboratory testing.