Mad River & Miami River Drinking Water Well Fields
Dayton, Ohio
The project included the design and construction of 66 large diameter gravel pack wells, which were completed at the Mad River and Miami River, well fields. The wells produce between 1,400 and 2,000 gallons per minute with a combined well field capacity of 82.5 million gallons of groundwater per day. The project was part of a comprehensive management and revitalization program for the City. Patriot provided the construction material testing for quality assurance on the project.