Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies
Music city center image

Nashville, Tennessee

Construction began in February 2010 at The Music City Center in Nashville Tennessee. The includes a 350,000-square-foot exhibit hall, 59 meeting rooms, two ballrooms, and 36 loading docks.

Patriot’s Responsibilities Included:

Our work includes the following tasks within areas of the building containing drywall:

  • Conduct bi-weekly inspections for evidence of water damage and/or suspect mold.
  • Collect moisture measurements from areas with evidence of water damage or suspected mold growth.
  • Collect relative humidity readings after completion of construction activities following the start-up of the building HVAC systems.
  • Collect representative air samples within the building for comparison to the outdoor ambient air samples after completion of construction activities following the start-up of the building HVAC systems.
  • Prepare a report of project activities reviewed and approved by a CIH.

Reduce Costs, Decrease Risks, and Improve Outcomes