Skip to Content

BROADWAY STREET BRIDGE

Dayton, Ohio

Patriot provides on call testing services to the City of Dayton for road  projects.      This  demanding  work  includes  deploying, testing, inspecting and returning to the laboratory with samples safely and efficiently, every time.  The Patriot certified technicians perform this work in all types of weather, traffic conditions  and  times  of  day  and  night  to  accommodate  the work schedule and pace of the construction crews. The timely reports that Patriot issues to the City provide vital information to the engineers as to whether a roadway is ready to open to traffic, whether a bridge pier can support a new load without the aid of temporary construction shoring, and other vital quality assurance measurements. The Broadway Street Bridge is a $2.4 million span over Wolf Creek and is the latest of nine bridges constructed by the City of Dayton in a decade-long, $53 million bridge replacement initiative. The two-span bridge is 180 feet long, with 10 foot wide sidewalks and pedestrian plazas at either end and in the middle. Construction was completed six weeks ahead of schedule and $125,000 under budget, according to city officials.